Cyprus High School

Summarize the project's program, features and achievements?

The New Cyprus High School Replacement project delivers a modern educational environment for Granite School District. The new campus combines contemporary architectural design with durable concrete panel construction and a custom design that is both visually striking and highly functional. Clean lines and natural materials contribute to collaboration, safety, learning, and student engagement.

A major focus of the project was improving the long-term safety and resilience of the campus. Due to the seismic vulnerabilities of the previous school and the site’s proximity to a major fault line, the new facility was engineered with advanced seismic design features to withstand future earthquake events. Reinforced concrete shear walls, moment-resisting frames, and deep foundation systems were incorporated throughout the structure to enhance stability and structural integrity. These systems provide students, staff, and the community with a safer and more resilient educational facility.

The project also showcased a high level of craftsmanship and coordination throughout construction. One of the most complex aspects of the build was incorporating more than 600 unique concrete tilt -up panels, each requiring specialized coordination. Every panel had to accommodate architectural features as well as electrical, mechanical, and plumbing systems, demanding precise planning and execution from the entire project team. Through collaboration between architects, engineers, subcontractors, and field teams, the project maintained quality standards while successfully managing the complexity of the design.

The completed Cyprus High School Replacement stands as a modern High School that demonstrates how concrete panel construction can successfully combine aesthetics in a school campus. The project created a safe, durable, and inspiring campus designed to support students and the Magna, UT community well into the future.

What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project?

The New Cyprus High School Replacement project presented several major challenges related to site conditions, scale, scheduling, and post-Covid supply chain disruptions. Built on a previously undeveloped 57 -acre site, the project required extensive preparation due to uneven terrain, unstable soils, and complex grading conditions. To overcome these obstacles, Westland Construction partnered closely with the design and engineering teams to implement advanced soil stabilization measures, including deep compaction and engineered grading solutions, creating a stable foundation for the 500,000+ square foot facility.

The sheer scale of the project, which became the largest high school in the state of Utah, required careful coordination and phased construction planning. Westland developed and executed a phased sitework and construction strategy that allowed critical infrastructure, structural systems, and building components to progress efficiently while accommodating the site’s challenging conditions and aggressive schedule demands.

In addition to site and logistical challenges, the project team successfully navigated industry-wide supply chain disruptions. Through early procurement, coordination with trade partners, and scheduling adjustments, Westland minimized delays and maintained steady project momentum. Despite these challenges, the team successfully delivered the new school in time for students and athletic programs to begin the 2025 -26 school year as scheduled.

Please communicate any engineering complexities or unique features of the panel design for this project?

Cyprus High School had several engineering complexities and unique panel design features that required planning, coordination, and sequencing throughout construction. One of the most significant challenges was the integration of more than 600 unique concrete tilt-up panels

The panel erection process required a carefully phased structural sequencing approach. Specific sections of concrete panels were erected first, allowing structural steel framing to be installed and tied into the building system before the next sequence of panels could be placed. This coordinated progression between tilt-panel erection and structural steel installation was critical to maintaining structural stability, site access, and overall schedule efficiency across the 500,000+ square foot facility.

 
Main banner image for Cyprus High School

Project Location

Magna, UT 84044
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

Developer/Owner:
 
General Contractor:
Westland Construction
Concrete Contractor:
Suntec Concrete
Architect:
Naylor Wentworth Lund
Engineer:
BHB Consulting Engineers PC
Suppliers:
 
Photographer(s):
Jared Kenitzer

Project Specifics

Project Category:
Schools
Building Types:
High School
Finishes:
Paint (Flat)
Features:
Formliner
Reveals
Insulation:
Sandwich Panel (Composite)
Uninsulated
Environmental:
Number of Floors:
4
Number of Panels:
625 panels
Tilt-Up Wall Area:
290,339 sq ft (26,972 sq m)
Total Floor Area:
505,500 sq ft (46,961 sq m)
Project Footprint:
265,285 sq ft (24,645 sq m)
Tallest Panel:
66 ft 8 in (20.32 m)
Widest Panel:
30 ft 8 in (9.35 m)
Largest Panel:
1,363 sq ft (126.6 sq m)
Heaviest Panel:
126,750 lbs (57,493 kg)