Seven Horses Transport

Summarize the project's program, features and achievements?

Building highlights:

  • modern general warehousing
  • 10 dock doors and 3 grade level doors
  • 36’ clear height for efficient storage density
  • ESFR sprinkler system
  • Permitted for Dangerous Goods (DG) storage
  • 750 PSF slab capacity
  • Secure gated facility with CCTV
 
Main banner image for Seven Horses Transport

Project Location

Surrey, BC V4P 3E6
Canada

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

Developer/Owner:
 
General Contractor:
 
Concrete Contractor:
RiteTech Construction
Architect:
 
Engineer:
Krahn Engineering LTD
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Storage
Building Types:
Warehouse
Finishes:
Paint (Flat)
Features:
Insulation:
Sandwich Panel (Non-Composite)
Environmental:
Number of Floors:
2
Number of Panels:
66 panels
Total Floor Area:
79,800 sq ft (7,413 sq m)
Project Footprint:
68,800 sq ft (6,392 sq m)
Tallest Panel:
43 ft 1 in (13.13 m)
Widest Panel:
28 ft 8 in (8.74 m)
Largest Panel:
1,236 sq ft (114.8 sq m)
Heaviest Panel:
160,000 lbs (72,575 kg)