Railspike Industrial is a ~150,000 SF spec industrial building in the supply-constrained near northeast submarket. Located in the deed-restricted Railwood Business Park, this front-load industrial building is being built on ~16.5 acres of land, providing over 100 trailer parks and over 2.5 acres of additional industrial outdoor storage. Designed with 32’ clear heights, ESFR sprinklers, 145’-255’ truck courts, and up to 3,000 amps of power, this project will provide the flexibility for a multitude of heavy industrial users or transportation and logistics companies.
The tilt-up method of construction was utilized for building. Reveals and formliner were added to the tilt walls to add texture and shadows. Tiltwall panels are overlapped to add rhythm and massing to the design of the facades. Pre-finished canopies and horizontal eyebrow sunshades were provided at the corner office pods to reduce the heat gain at the windows. Wood-grain finished metal panels were provided on the soffits to accent the corner office pods. Clerestory windows provide daylighted into the warehouse and dock areas of the buildings.
A primary challenge on this project was the presence of an active Union Pacific rail line crossing the only site entry point, which significantly impacted the project schedule, coordination, and overall execution. Extensive coordination with Union Pacific was required for all utility installations, including multiple bores beneath the railroad, which introduced additional planning constraints and logistical hurdles.
From a permitting standpoint, coordination with Union Pacific added complexity and extended timelines. Railroad approvals, flagging requirements, and insurance provisions had to be secured well in advance, requiring proactive planning and constant communication to avoid delays. Site access restrictions also affected the project schedule and logistics. Deliveries were carefully sequenced to align with approved crossing times, and staging areas were used to minimize repeated crossings. Any disruption or delay on the rail line had a direct impact on productivity, requiring flexibility in scheduling. Safety was a critical focus due to the proximity of active rail operations. Enhanced site-specific safety plans, mandatory training, and coordination with railroad flaggers ensured that all activities near the crossing were properly controlled and compliant.
Despite these constraints, the team successfully mitigated impacts through detailed preplanning, strong coordination with Union Pacific, and disciplined execution, allowing the project to maintain progress while meeting safety requirements.
The panel design included several complexities requiring careful coordination. The entry flag panels were particularly challenging due to their size and orientation. These panels required detailed site coordination to ensure proper layout, along with specialized rigging coordination with the erector for safe and accurate placement.