WDS is the North American leader in insurer wildfire services. This building in Post Falls, Idaho, serves as a secondary headquarters for the company as well as a private fire station, wholesale store, dispatch center and fire vehicle upfitting/outfitting assembly shop. Truly a lot of functions to place in one facility. Tilt-up construction provided a durable medium to create this great project. Key attributes include:
This tight site, sloped floors, and polished concrete floors meant that many casting slabs were needed. This coupled with a late start meant winter weather was in play and we still needed to deliver on the time and budget promised a year earlier. To solve for these issues the following complexities were addressed by the project team:
Crane planning was critical to maneuver around all obstacles to make the erection process a success.
The design team wanted continuous glass at the office area of the building with the appearance of the concrete floating above the glass. In order to create this look, the exterior of the panel would need to be recessed 5 ½”. Rather than recessing into the structural section on the panel, we elected to utilize sandwich panels. By utilizing the Thermomass system, we were able to blockout the outer wythe and insulation to create the clearance for the storefront system. This approach created a seamless look both inside and out. Coordination with Thermomass’s engineers and the engineer of record was critical in order to provide adequate support for the floating concrete members and address long-term issues such as creep.
Another element where tilt-up was utilized was the exterior canopy supports. These panels create some architectural interest while tying into the exterior building finishes. This also allowed for a concrete walkthrough for gate access, increasing the sense of security.
Post Falls, ID 83854
United States