Plum Creek Logistics Center - Buildings 1 and 2

Summarize the project's program, features and achievements.

On August 17, 2020, Rosenberger Construction broke ground on Plum Creek Logistics Center Phase I. This industrial, tiltwall project consists of Buildings 1 and 2, two speculative buildings totaling 471,058 square feet. The project also included an MEP design/build and an ESFR sprinkler system. Rosenberger also completed a 3,900 square feet MEP design/build tenant improvement with upgraded electrical service and warehouse improvement. Inside, the LED high bay light fixtures are equipped with individual motion sensors, all designed to emphasize the design and overall size. The outside of the buildings is painted, textured tiltwall with accent colors. Rosenberger Construction completed Plum Creek Logistics Center Phase I on May 12, 2021, seven weeks ahead of schedule.

 
Main banner image for Plum Creek Logistics Center - Buildings 1 and 2

Project Location

Kyle, TX 78640
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
Rosenberger Construction LP
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):
Andrew Meskin

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Warehouse
Finishes:
Paint (Textured)
Features:
Reveals
Insulation:
Uninsulated
Environmental:
Number of Floors:
1
Number of Panels:
212 panels
Tilt-Up Wall Area:
220,000 sq ft (20,438 sq m)
Total Floor Area:
471,058 sq ft (43,761 sq m)
Project Footprint:
471,058 sq ft (43,761 sq m)
Tallest Panel:
50 ft 11 in (15.52 m)
Widest Panel:
27 ft 11 in (8.51 m)
Largest Panel:
1,295 sq ft (120.3 sq m)
Heaviest Panel:
153,440 lbs (69,599 kg)