Golden Triangle Construction Headquarters

Summarize the project's program, features and achievements.

Intergroup was selected by GTC, a prominent Denver area general contractor to design their new office headquarters. The building is a concrete Tilt-Up wall paneled building on a two-acre site. Exterior panels offer reveals, metal awnings, horizontal metal fins, multiple glazing colors, and exterior paint accents to highlight the design. The Interior space has both private and open office areas, and a large training room. Ceilings are open to structure and are fitted with acoustical treatments and light fixtures.

Communicate any engineering complexities or unique features of the panel design for this project.

Structural engineering accounted for large openings in Tilt-Up panels for glazing and wall reveals. A key panel with several reveals was poured and utilized in the entrance design. This key wall panel is a facility accent that extends from the exterior entrance into the interior reception and conference room.

 
Main banner image for Golden Triangle Construction Headquarters

Project Location

Frederick, CO 80504
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
All-Phase Concrete Construction Inc
Architect:
Intergroup Architects Inc
Engineer:
 
Suppliers:
 
Photographer(s):
Golden Triangle Construction

Project Specifics

Project Category:
Office
Building Types:
Office
Finishes:
Paint (Textured)
Features:
Voids
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
1
Number of Panels:
29 panels
Tilt-Up Wall Area:
10,585 sq ft (983 sq m)
Total Floor Area:
14,100 sq ft (1,310 sq m)
Project Footprint:
14,100 sq ft (1,310 sq m)
Tallest Panel:
26 ft 5 in (8.05 m)
Widest Panel:
36 ft 0 in (10.97 m)
Largest Panel:
951 sq ft (88.3 sq m)
Heaviest Panel:
73,500 lbs (33,339 kg)