Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Yulista

Yulista Holding LLC, now headquartered in Huntsville, Alabama has a four-building campus within the Redstone Gateway. This campus will include a multi-floor office building and three research and development facilities. The Yulista COPT 7500 AC Fabrication and Integration Building is one of the buildings located on this campus. It features a 131,376 sf concrete slab on grade measuring 6" thick with 4000 psi fly ash concrete. Some of the 75 tilt panels used to construct this facility feature insulation inside the panels. Some sandwich panels 10" thick composite panels with insulation as well as 12" thick non-composite panels with insulation. The panel insulation was provided by Thermomass Insulation Systems.  
Main banner image for Yulista

Project Location

Huntsville, AL
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Martin Concrete Construction Inc
Architect:
Powers Brown Architecture
Engineer:
LJB Inc.
Suppliers:
Martin Concrete Construction Inc
Photographer(s):
Martin Concrete Construction

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Finishes:
Paint (Textured)
Features:
Insulation:
Sandwich Panel (Composite)
Sandwich Panel (Non-Composite)
Environmental:
Number of Floors:
1
Number of Panels:
75 panels
Tilt-Up Wall Area:
59,216 sq ft (5,501 sq m)
Total Floor Area:
131,376 sq ft (12,205 sq m)
Project Footprint:
131,376 sq ft (12,205 sq m)
Tallest Panel:
39 ft 0 in (11.89 m)
Widest Panel:
37 ft 0 in (11.28 m)
Largest Panel:
38 sq ft (3.5 sq m)
Heaviest Panel:
169,000 lbs (76,657 kg)