Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

I-97 Business Park Phase III

I-97 Business Park Phase 3 is a five-story Class A, core and shell office building was constructed utilizing tilt wall construction and brick cladding with the main entrances featuring aluminum composite metal panels and full floor to ceiling curtainwall glazing. Construction of the 126,283 SF office building was completed as part of the St. John Properties’ I-97 Business Park Phase III development, a 67-acre business community near the Baltimore-Washington International Thurgood Marshall Airport. This is Maryland’s first five-story, tilt-up constructed office building. The building design utilized a 4+1 tilt-up construction method, with the panels cast and installed in two sets. The first set of panels are approximately 60’ tall by 30’ wide and serve to support all four levels of floor framing. The second set of panels are 18’ tall by 60’ wide and serve to complete the fifth floor. The top story panels have 55’ wide openings to allow for continuous ribbon window glazing. The interior sports shower rooms, three stairwells, three elevators, a digital directory, and wood and porcelain finishes with entirely LED lighting.  
Main banner image for I-97 Business Park Phase III

Project Location

Millersville, MD
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2020

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Precision Concrete Const Co
Architect:
Powers Brown Architecture
Engineer:
Morabito Consultants Inc
Suppliers:
 
Photographer(s):
Ron Solomon

Project Specifics

Project Category:
Office
Building Types:
Office
Finishes:
Brick (Thin)
Paint (Textured)
Features:
Formliner
Reveals
Insulation:
Environmental:
LEED Certified - Silver
Number of Floors:
5
Number of Panels:
44 panels
Tilt-Up Wall Area:
54,208 sq ft (5,036 sq m)
Total Floor Area:
126,283 sq ft (11,732 sq m)
Project Footprint:
25,083 sq ft (2,330 sq m)
Tallest Panel:
60 ft 0 in (18.29 m)
Largest Panel:
1,800 sq ft (167.2 sq m)