700 Tech Court

Project summary provided by submitting company.

Design of this new 136,610 SF office/warehouse features expansive glazing, clerestories, and skylights throughout the building creating abundant daylighting for the interior spaces. This allows for the building to support 100% office clients. Numerous tilt-up features including offsets, reveals, and full height corner glazing panels establish the buildings character. Concrete tilt-up panels with steel frame make up the building's construction. Use of tilt-up construction allows for flexibility and cost efficiency for future high tech tenants.

 
Main banner image for 700 Tech Court

Project Location

Louisville, CO
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2019

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
All-Phase Concrete Construction Inc
Architect:
Intergroup Architects Inc
Engineer:
 
Suppliers:
 
Photographer(s):
Etkin Johnson

Project Specifics

Project Category:
Distribution
Building Types:
Office
Warehouse
Finishes:
Paint (Flat)
Paint (Textured)
Features:
Insulation:
Environmental:
Number of Floors:
1
Number of Panels:
107 panels
Tilt-Up Wall Area:
66,158 sq ft (6,146 sq m)
Total Floor Area:
136,610 sq ft (12,691 sq m)
Project Footprint:
136,610 sq ft (12,691 sq m)
Tallest Panel:
40 ft 10 in (12.45 m)
Heaviest Panel:
260 lbs (118 kg)
Longest Spandrel:
27 ft 8 in (8.43 m)