Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Encompass 150

Project summary provided by submitting company.

Core and shell tilt-up construction speculative office and industrial building. Building slopes 0.5% which saved on excavation and grading costs. This is the first building of a multi-building business park.

 
Main banner image for Encompass 150

Project Location

Centennial, CO
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
Intergroup Architects Inc
Engineer:
Peak Engineering, Inc.
Suppliers:
 
Photographer(s):
Jim Johnson Photography

Project Specifics

Project Category:
Office
Building Types:
Distribution Center
Office
Finishes:
Paint (Textured)
Features:
Formliner
Reveals
Insulation:
Uninsulated
Environmental:
Number of Floors:
1
Number of Panels:
86 panels
Tilt-Up Wall Area:
72,000 sq ft (6,689 sq m)
Total Floor Area:
150,000 sq ft (13,935 sq m)
Project Footprint:
150,000 sq ft (13,935 sq m)
Tallest Panel:
38 ft 0 in (11.58 m)
Widest Panel:
27 ft 6 in (8.38 m)
Largest Panel:
908 sq ft (84.4 sq m)
Heaviest Panel:
50,000 lbs (22,680 kg)