Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Dixie Middle School

In order to obtain cost efficient buildings, the Washington County School District, for the past many years, has been constructing their educational facilities with concrete tilt-up. This economical option makes for faster construction.

This project was not only a challenge to design but also to build. Concrete tilt-up panels varied greatly in geometry. There were many spandrel and cantilevered panels to accommodate entryways, large openings, etc. Sandwich panels were used in some locations for exterior walls in areas that required a durable wall surface. Some of these areas were the gymnasium, wrestling room, cabinet shop, welding shop, etc. Due to the complexity of the panels, an elevation of every concrete tilt-up panel was done not only architecturally but also structurally. The project included tilt-up panels next to CMU and there was creativity in attaching the tilt-up panels with unseen connections.

The school district not only got a cost efficient high school campus, but due to the tilt-up panel construction, the building was able to be constructed in 20 months. Many school officials from other districts have expressed that they are amazed at how great the facility looks, especially when they realize how it was constructed and the associated cost. When the cost of construction was compared to other high schools under construction in Utah around the same time, the Washington County School District got "more building" for less money. Upon seeing the Dixie Middle School campus, it is assumed, based on how the school campus looks, that it must have cost much more to construct than it did.

 
Main banner image for Dixie Middle School

Project Location

St. George, UT 84770
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

EXCELLENCE

2015

The excellence designation is given to the highest scoring projects each year representing the top 10-12 projects. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
BHB Consulting Engineers PC
HK Composites, Inc.

Project Specifics

Project Category:
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Tilt-Up Wall Area:
40,969 sq ft (3,806 sq m)
Total Floor Area:
164,896 sq ft (15,319 sq m)
Tallest Panel:
31 ft 4 in (9.55 m)
Widest Panel:
37 ft 11 in (11.56 m)
Largest Panel:
980 sq ft (91.0 sq m)
Heaviest Panel:
76,150 lbs (34,541 kg)