Karbach Brewing Co. Packaging Hall

Project summary provided by submitting company.

The Karbach Packaging Hall is a part of Karbach Brewing Company's growing brewery complex in Houston, Texas. Located just outside Houston's inner loop, the 50,351 square-foot, two-story facility serves as the canning, packaging and storage warehouse as well as corporate offices for the brewery.

One of the focuses for this project was to create a uniform aesthetic for the complex and to blend in the new construction with the existing brewery, taproom and restaurant. This was achieved by utilizing form liner and tilt-wall panel construction to simulate metal panel which was used in the Karbach brewery and restaurant project completed in 2015.

In 2016, Karbach Brewing Co. was acquired by Anheuser-Busch, leading to additional growth and the need for ramped up production volumes. This new facility will allow for the brewery to increase local production and distribution across Texas and expand into neighboring states. Karbach plans to produce 150,000 barrels in 2019 with this new facility.

 
Main banner image for Karbach Brewing Co. Packaging Hall

Project Location

Houston, TX
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
 
Concrete Contractor:
 
Architect:
METHOD architecture, LLC
Engineer:
Pinnacle Structural Engineers
Suppliers:
 
Photographer(s):
Keith Carter Photography

Project Specifics

Project Category:
Production/Manufacturing
Building Types:
Distribution Center
Manufacturing Plant
Office
Finishes:
Brick (Thin)
Paint (Flat)
Stucco
Features:
Formliner
Reveals
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
2
Number of Panels:
31 panels
Tilt-Up Wall Area:
25,425 sq ft (2,362 sq m)
Total Floor Area:
50,351 sq ft (4,678 sq m)
Project Footprint:
47,543 sq ft (4,417 sq m)
Tallest Panel:
36 ft 6 in (11.13 m)
Widest Panel:
31 ft 6 in (9.60 m)
Largest Panel:
1,134 sq ft (105.3 sq m)
Heaviest Panel:
130,000 lbs (58,967 kg)