Laguna Springs Professional Center Phase 4 - Building B

Building B is four-story tilt-up building designed with column-free, clear-span floor plates making for efficient and flexible space planning. Two tilt-up shear walls are integrated into an efficient core design, eliminating the need for perimeter brace frames. The tilt-up panels offer floor-to-ceiling glass, allowing people to look out and natural light to come in. Tilt-up panels arranged around the building are in off-set layers and recesses that incorporate various window sizes and patterns.

 
Laguna Springs Professional Center Phase 4 - Building B

Project Location

Elk Grove, CA 95758
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
 
Concrete Contractor:
 
Architect:
LPAS
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Total Floor Area:
110,372 sq ft (10,254 sq m)
Project Footprint:
36,790 sq ft (3,418 sq m)
Tallest Panel:
66 ft 10 in (20.37 m)
Widest Panel:
37 ft 0 in (11.28 m)
Largest Panel:
2,214 sq ft (205.7 sq m)
Heaviest Panel:
183,390 lbs (83,184 kg)