Hub 25 Buildings 1-4

Hub 25 consisted of four buildings of various sizes. The largest building was 143,312 square feet and the smallest was 43,507 square feet. The project featured unique geometric corners. All four buildings were built in tandem, allowing the sub contractors to move from one building to the next with little delay. The project was featured on the 2016 TCA Annual Convention Tour.

 
Hub 25 Buildings 1-4

Project Location

Denver, CO
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
 
Concrete Contractor:
KB Concrete Systems, Inc.
Architect:
 
Engineer:
Peak Engineering, Inc.
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Tilt-Up Wall Area:
207,400 sq ft (19,267 sq m)
Total Floor Area:
421,499 sq ft (39,157 sq m)
Tallest Panel:
39 ft 6 in (12.04 m)
Widest Panel:
42 ft 0 in (12.80 m)
Largest Panel:
1,140 sq ft (105.9 sq m)
Heaviest Panel:
127,300 lbs (57,742 kg)
Longest Spandrel:
42 ft 0 in (12.80 m)
Recycled Content:
366 tons (US)