Thatcher Chemical

Tilt-up was selected for the Thatcher Chemical concrete warehouse and office building, a challenging project amid ongoing plant operations. The building's proximity to existing railroad tracks and delivery truck routes presented challenges for casting slabs, which were resolved by stacking. Additional challenges included different elevations to accommodate the interior containment areas and the 1-percent slope floor on the warehouse, with footings from 2 to 8 feet below the finish floor.

 
Thatcher Chemical

Project Location

Las Vegas, NV 89109

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Production/Manufacturing
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
34 panels
Tilt-Up Wall Area:
38,607 sq ft (3,587 sq m)
Total Floor Area:
32,759 sq ft (3,043 sq m)
Project Footprint:
32,759 sq ft (3,043 sq m)
Tallest Panel:
45 ft 2 in (13.77 m)
Widest Panel:
33 ft 4 in (10.16 m)
Largest Panel:
1,452 sq ft (134.9 sq m)
Heaviest Panel:
356 lbs (161 kg)
Tallest Cantilever:
36 ft 6 in (11.13 m)