Express Scripts

This four-story, 234,000-square-foot, Class-A office building utilized Tilt-Up construction for the exterior facade. Featuring a 13,000-square-foot data center with high levels of security provisions and backup systems, the facility was constructed of Tilt-Up panels over structural steel framing. The Tilt-Up panels were 34 feet wide by 68 feet tall and weighed close to 230,000 pounds. In addition, the panels had 30-foot wide windows on each level. The Tilt-Up bracing system was designed to withstand tornado force winds.

This project had a very aggressive schedule and was completed in eight months from the start of foundations to the owner taking occupancy. The Tilt-Up portion of the job took only seven weeks, which included the beginning of forming of panels to the last panel erected. In addition, this project is LEED CS v2.0 registered.

 
Main banner image for Express Scripts

Project Location

Berkeley, MO 63134
United States

Project Images

Search Project Database

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
Clayco
Concrete Contractor:
Forum Studio
Concrete Strategies, Inc.
Architect:
Forum Studio
Engineer:
Meadow Burke
Alper Audi, Inc.
Suppliers:
Nox-Crete Products Group
Meadow Burke
Photographer(s):
Matthew McFarland

Project Specifics

Project Category:
Office
Building Types:
Office
Finishes:
Paint (Textured)
Features:
Reveals
Shadow Panels
Insulation:
Post Applied (Interior)
Environmental:
LEED Certified
Number of Floors:
4
Number of Panels:
105 panels
Tilt-Up Wall Area:
69,000 sq ft (6,410 sq m)
Total Floor Area:
234,000 sq ft (21,739 sq m)
Project Footprint:
234,000 sq ft (21,739 sq m)
Tallest Panel:
68 ft 0 in (20.73 m)
Widest Panel:
34 ft 0 in (10.36 m)
Largest Panel:
2,346 sq ft (217.9 sq m)
Heaviest Panel:
220 lbs (100 kg)