Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Building with Tilt-Up | Project Profiles

Falls Lake Academy

TCA Tilt-Up Project Profile - Educational Division

Article tools: Coming soon!

Photos

Project Specifics

Project Wall Area
50,950 sq ft
(4,733 sq m)
Project Floor Area
64,700 sq ft
(6,011 sq m)
Project Footprint
64,700 sq ft
(6,011 sq m)
Tallest Panel
33 ft 3 in
(10.13 m)
Widest Panel
63 ft 8 in
(19.41 m)
Largest Panel
1,330 sq ft
(123.6 sq m)
Heaviest Panel
80,310 lbs
(36,428 kg)

Participating TCA Members

ThermomassSustaining Member icon
Insulation systems
A.H. Harris & Sons, Inc.Sustaining Member icon
Tilt-up accessories

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.