Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Building with Tilt-Up | Project Profiles

San Marcos High School

TCA Tilt-Up Project Profile - Educational Division

Article tools: Coming soon!

Photos

Project Specifics

Total Panels (Single Building)
312 panels
Project Wall Area
169,784 sq ft
(15,773 sq m)
Project Floor Area
422,600 sq ft
(39,260 sq m)
Project Footprint
225,000 sq ft
(20,903 sq m)
Tallest Panel
65 ft 0 in
(19.81 m)
Widest Panel
9 ft 0 in
(2.75 m)
Largest Panel
861 sq ft
(80.0 sq m)
Heaviest Panel
170,000 lbs
(77,111 kg)
Longest Spandrel Panel
30 ft 0 in
(9.14 m)

Participating TCA Members

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.