Limited space and site constraints for this structure on an existing campus located in a metropolitan area created a huge logistic challenge and required a great deal of planning. Project scope included all cast-in-place and Tilt-Up concrete, as well as structural steel and hollow-core planks.

With the exception of a 30-foot wide crane access road, the available area on-site was completely covered with temporary casting slabs. This provided enough casting area to construct the building walls in two sequences. There was no access on three sides of the building, so the walls, structural steel, and hollow-core planks had to be erected from inside the building footprint. Once the walls were in place, structural steel erection commenced, followed by the hollow-core planks and topping pours. This allowed the installation of interior framing, wiring and mechanical systems to begin on the first half of the building. During this time, the casting beds were reused for the construction of sequence two panels. The erection process was repeated on the second half of the building, followed by the installation of underground plumbing and electrical pipes and conduits, and ultimately the slab-on-grade. The structure was completed in 15 weeks, and interior work was able to commence in only 11 weeks, minimizing the overall duration of construction.

Utilizing the Tilt-Up system was instrumental in helping the design and construction teams achieve the challenging logistical and schedule issues. The building’s design reflects the clean and functional expression of the structure, utilizing extensive glazing panels at key locations to emphasize the vertical circulation elements of the building and to enable natural light to penetrate the common areas of the building. Tilt-Up panel rustication and a deeper color were used at the first floor of the building to "ground the building" and give it a more human scale; colored panels help to define and give depth to layered tilt panels that emphasize the vertical nature of the building.

Photos

Project Specifics

Total Panels (Single Building)
36 panels
Project Wall Area
28,574 sq ft
(2,655 sq m)
Project Floor Area
44,000 sq ft
(4,088 sq m)
Project Footprint
10,200 sq ft
(948 sq m)
Tallest Panel
56 ft 10 in
(17.32 m)
Widest Panel
24 ft 6 in
(7.47 m)
Largest Panel
1,430 sq ft
(132.8 sq m)
Heaviest Panel
133,189 lbs
(60,414 kg)
Longest Spandrel Panel
8 ft 3 in
(2.51 m)
Recycled Content
112 tons (US)

Participating TCA Members

Woodland Tilt-UpSustaining Member iconSustaining Member icon
Tilt-Up subcontractor
Permit Engineering Services Inc
Tilt-Up engineer
Meadow BurkeSustaining Member icon
Lifting hardware
HD Supply Construction & Industrial White Cap
Bracing hardware
Nox-Crete Products GroupSustaining Member icon
Form release

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.