Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Building with Tilt-Up | Project Profiles

Wold Performing Arts Center

TCA Tilt-Up Project Profile - Special Projects Division

Article tools: Coming soon!

Photos

Project Specifics

Project Wall Area
60,727 sq ft
(5,642 sq m)
Project Floor Area
30,000 sq ft
(2,787 sq m)
Project Footprint
40,000 sq ft
(3,716 sq m)
Tallest Panel
59 ft 0 in
(17.98 m)
Widest Panel
49 ft 0 in
(14.94 m)
Largest Panel
945 sq ft
(87.8 sq m)
Heaviest Panel
177,200 lbs
(80,377 kg)
Tallest Cantilever Panel
12 ft 0 in
(3.66 m)
Longest Spandrel Panel
49 ft 0 in
(14.94 m)

Participating TCA Members

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.