Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Building with Tilt-Up | Project Profiles

High Desert Harley Davidson

TCA Tilt-Up Project Profile - Retail Division

Article tools: Coming soon!

Photos

Project Specifics

Total Panels (Single Building)
65 panels
Project Wall Area
35,400 sq ft
(3,289 sq m)
Project Floor Area
51,600 sq ft
(4,794 sq m)
Project Footprint
34,320 sq ft
(3,188 sq m)
Tallest Panel
33 ft 2 in
(10.12 m)
Widest Panel
54 ft 10 in
(16.73 m)
Largest Panel
1,024 sq ft
(95.1 sq m)
Tallest Cantilever Panel
33 ft 2 in
(10.12 m)
Longest Spandrel Panel
55 ft 0 in
(16.76 m)

Participating TCA Members

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.