Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Building with Tilt-Up | Project Profiles

WTVJ/NBC6 Broadcast Facility

TCA Tilt-Up Project Profile - Special Projects Division

Article tools: Coming soon!

Tilt-Up was the immediate choice for Special Projects category winner WTVJ Channel 6 (South Florida's NBC affiliate) when they sought a world-class headquarters and broadcast facility.

Designed with the intent of being the area's first all digital TV station, it was essential that the construction medium easily accommodate flexibility, fully integrated technology systems, Category V hurricane protection, and redundant power systems with reliability at 99.99 percent -- all challenges that solidified the owner's decision to use Tilt-Up.

Being an icon for the community and its prominent location near the Dade/Broward County line along busy Interstate I-75, attractive architecture was essential and achieved through the use of a 108-foot high broadcast tower featuring the NBC logo.

The tower was value engineered and Tilt-Up was selected due to its ability to save costs. Beyond adding an architectural element to the facility, the tower is highly functional and houses the microwave radio dish, lightening protection and ionization mechanisms.

In addition to the technical requirements of incorporating 125 monitors, state-of-the-art computer editing technology and hundreds of miles of complex digital cabling systems, it was crucial that the transition from the former Miami-based broadcast center to the new Miramar-based facility occur without ever going "off air" or experiencing any operational downtime. This successful transition required an enormous coordination effort between WTVJ's internal systems engineers and the design-build team led by Miller Construction Company.

For more information on this project, contact Coty Fournier at (954) 764-6550.

Photos

Project Specifics

Participating TCA Members

LJB Inc.Sustaining Member icon
Project engineer
Dayton Superior CorporationSustaining Member icon
Tilt-Up accessories

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.