Stapleton Business Center Building D-4

2006 TCA Tilt-Up Achievement Award - Warehouse/Distribution Division

Article tools: Coming soon!

Located at the main entry to a business park right off a major freeway, this facility serves as the gateway to the park, which made curb appeal extremely important.

The design utilizes four large curved walls at the corners. Each wall ends with a flying panel separated from the rest of the building by a glass wall. The curved wall is segmented for speed of panel forming. Double-sided panels give the back side a finished look with substantial thickness. The steel/aluminum entry canopy pierces the last segment of the curve, which required close coordination between the steel and concrete panel during design and erection.

The building was erected in two phases to enable other trades to work while panel casting continued to ensure the fast-track schedule was met.

All four corner entries feature a segmented arched entry that utilizes eight 9-foot, 8-inch-wide panels with beveled edges that were placed on the radius segment. Each entry also has a double-faced freestanding panel with double-faced spandrel panels bearing on those panels and pilasters poured on the segmented panels.

Rooftop screening was a major concern because of the project’s close location to the highway. Screening was accomplished by using taller parapet panels and pouring stand up return legs on several panels.

Photos

Project Specifics

Project Floor Area
360,000 sq ft
(33,444 sq m)
Tallest Panel
46 ft 6 in
(14.17 m)
Largest Panel
909 sq ft
(84.4 sq m)
Heaviest Panel
86,200 lbs
(39,100 kg)

Participating TCA Members

Peak Engineering, Inc.
Project engineer

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.