Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Awards | TCA Tilt-Up Achievement

Valley Creek Church Expansion

2010 TCA Tilt-Up Achievement Award - Spiritual Division

Article tools: Coming soon!

Built to meet the needs of the growing congregation at Valley Creek Church, the expansion houses youth worship areas, a nursery and adult education classrooms. Fenestrations incorporated into the design allow for natural light to illuminate the two large double-volume worship areas, and the oversized circular windows allow the adult education and the youth areas (on the second floor) to take advantage of views and natural light, while the nursery is tucked under with smaller openings to shade and protect.

This 23,105-square-foot expansion complements the existing 41,586-square-foot facility in that it distinguishes the old from new with the use of innovative, cost-effective materials and techniques from Tilt-Up, and continues the exterior stone banding of the existing structure. Tilt-Up construction was used in lieu of a metal building structure (which was used for the original church) for its durability, strength, construction schedule advantages and cost.

Designed with a gentle curve, the structure provides spatial interest, while playful elevations with large geometric shapes draw the attention of the passer-by. In addition, reveals and recessed areas were used to express the curvature of the design and symbolic cross and to blend the original church to its new addition. The architect enhanced “highway presence” and community recognition, while incorporating religious symbolism by using a combination of concrete, stone, steel and glass materials.

Photos

Project Specifics

Project Wall Area
12,750 sq ft
(1,184 sq m)
Project Floor Area
23,105 sq ft
(2,146 sq m)
Project Footprint
11,230 sq ft
(1,043 sq m)
Tallest Panel
34 ft 6 in
(10.52 m)
Widest Panel
29 ft 2 in
(8.91 m)
Largest Panel
943 sq ft
(87.6 sq m)
Heaviest Panel
108,977 lbs
(49,431 kg)
Tallest Cantilever Panel
4 ft 0 in
(1.22 m)
Longest Spandrel Panel
20 ft 5 in
(6.24 m)

Participating TCA Members

Alliance Architects, Inc.
Architect

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.