Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Awards | TCA Tilt-Up Achievement

Scarborough Office Building

2009 TCA Tilt-Up Achievement Award - Office Division

Article tools: Coming soon!

Blurring the lines between the industrial and residential areas that it borders, the 41,300-square-foot Scarborough Office Building in Davie, Fla., proves that time and budget constraints don’t have to add up to an unattractive building.

While the original concrete masonry design of the structure would have taken longer and been more costly, the Tilt-Up alternative was completed in just six months and provided a cost savings. Boasting immense curb appeal, the building features an overhanging second floor that creates a covered walkway. To create the walkway, precast joists were cantilevered over the first-floor tilt walls, and the second-floor walls were set on cast-in-place columns. Multiple panel thicknesses and creative bracing techniques were required to accommodate the slightly larger second floor.

Other eye-catching architectural features include decorative EIFS bands at the windows and the parapet, as well as the blending of Mediterranean cream and coral colors with tan and burgundy accents.

Photos

Project Specifics

Project Wall Area
47,716 sq ft
(4,433 sq m)
Project Floor Area
41,300 sq ft
(3,837 sq m)
Project Footprint
18,000 sq ft
(1,672 sq m)
Tallest Panel
38 ft 7 in
(11.76 m)
Widest Panel
42 ft 7 in
(12.99 m)
Largest Panel
818 sq ft
(76.0 sq m)
Heaviest Panel
131,620 lbs
(59,702 kg)
Tallest Cantilever Panel
38 ft 7 in
(11.76 m)
Longest Spandrel Panel
42 ft 7 in
(12.99 m)

Participating TCA Members

Woodland Tilt-UpSustaining Member iconSustaining Member icon
Tilt-Up contractor
Johnson Structural Group Inc
Structural engineer
Meadow BurkeSustaining Member icon
Lifting hardware, Braces
Nox-Crete Products GroupSustaining Member icon
Bond breaker
Textured Coatings of America Inc
Paint

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.