Fast Track Delivery
You may be surprised at all of the advantages Tilt-Up construction has to offer.

Design-build - the fast delivery system for your project where building construction proceeds while the design is developed, speeding completion. Tilt-Up lends itself to this process because wall panel construction can proceed while the rest of the building is designed.

You'll get earlier occupancy - when you decide to build, you want to proceed quickly. With Tilt-Up, you get compression of disciplines - many phases are completed simultaneously. Therefore, you can move into your building sooner.

Assembly line prefabrication - load-bearing reinforced concrete wall panels are cast horizontally on the floor slab or a casting slab, and are tilted up into their final vertical position with high-capacity mobile cranes. The entire process is designed for efficiency and speed of erection.

Trades get in sooner - because the floor slab is poured first, the other trades can work sooner and in a better work environment, which saves time and money.

Materials and labor are more readily available - site-cast Tilt-Up uses ready mixed concrete usually available near the job site. Contractors use local labor.

Back to 'Tilt-Up Benefits' index

 

 

Related Content
Here are a few other links that you might be interested in.

Frequently Asked Questions

Basics of Tilt Construction

Upcoming TCA Events
Member Resources
Access member resources for unique literature and other information.

Not a member?

Join Today!