Tilt-Up Concrete Assn.
PO Box 204
113 First Street W
Mt. Vernon, Iowa 52314
T: (319) 895-6911
F: (320) 213-5555
info@tilt-up.org
ADC Loon
Tilt-Up Basics: Concrete
Review the basic methods and skills of modern Tilt-Up construction

Before placing concrete for Tilt-Up panels, clean the base slab. Use compressed air to blow away dirt, leaves, and other loose debris. Also, remove any standing water on the slab.

Concrete placement methods for Tilt-Up panels are the same as those for floor slabs. Since the panels are structural members, make sure the concrete mix meets specifications. Direct chute placement is the most economical method, but pumping and bucket placement also work. Consolidate the concrete to ensure good flow around the reinforcing steel. A trowel finish is suitable for most projects.

As with other types of concrete construction, plan for the unexpected. If the weather will be cold, have insulation blankets ready. If it looks like rain, delay the pour or have a suitable covering material available. Provisions should be made to block off a pour if a concrete truck breaks down or gets stuck in traffic. On hot or windy days, be prepared to cure the panels by water misting or by applying a suitable curing compound.

Back to 'Tilt-Up Basics' index

 

 

 

 

 

Related Content
Here are a few other links that might interest you.

Frequently Asked Questions

Benefits of Tilt Construction

Upcoming TCA Events
Member Resources
Access member resources for unique literature and other information.

Not a member?

Join Today!