Al Meiklejohn Elementary School

Al Meiklejohn Elementary School

2007 Tilt-Up Achievement Award Winner :: Education Division

Submitted by: Saunders Construction, Inc.

The Jefferson County School District had a simple goal: They needed to construct the largest elementary school ever built in their district in record time. When Saunders Construction, which had previously built a Tilt-Up charter school in the same district, came onto the project, the schedule was already tight—but it was made even more so by the decision to use a structural floor over a crawlspace instead of the previously designated slab-on-grade.

An even more concerning issue was the team had already designed into the project interior Tilt-Up walls. In fact, there is not a steel column anywhere in the building.

This choice of a structural floor added nearly seven weeks of design and construction to the project, while the project completion date remained the same. Saunders met the expedited schedule by phasing the panel design and construction to reflect the building’s four quadrants, while design proceeded on the rest of the structure. The new floor style also required 70,000 square feet of casting bed to be erected around the building for panel forming.

The fastest-designed ground-up school ever constructed in the district, the 68,000-square-foot Al Meiklejohn Elementary was built in just ten months and features a host of inviting features, including letters, numbers and musical notes formed from foam cutouts and recessed into the panels, as well as a front entry canopy decorated with laser-cut perforated metal panels shaped like stars, suns and moons.

TCA Member Participants
Saunders Construction, Inc. (Centennial, Colorado)
Role: General Contractor, Tilt-Up Contractor
Kopf Consulting Group (Marietta, Georgia)
Role: Consultant
Meadow Burke (Sacramento, California)
Products: Lifting and bracing hardware
Scott System (Denver, Colorado)
Products: Thin-brick
White Cap Construction Supply (San Juan Capistrano, California)
Products: Construction material
Composite Technologies Corporation (Boone, Iowa)
Products: Insulation

The purpose of the TCA Awards Program is to recognize outstanding site cast Tilt-Up structures and advances in technology, products and methods used in the Tilt-Up industry. For more information on the program, submittal requirements and deadline dates, please refer to the awards submittal information page.

If you have further questions, please contact Jim Baty by email or by phone at (319) 895-6911.

Project Information

Al Meiklejohn Elementary
13405 West 83rd Place
Arvada, CO 80005

Quick Facts
Tallest Panel:
35'-8"
Largest Panel:
1,149 sq ft
Heaviest Panel:
103,000 lbs
Photographs

Click on any photo to enlarge it

Al Meiklejohn Elementary exterior

Al Meiklejohn Elementary exterior

Al Meiklejohn Elementary exterior

Al Meiklejohn Elementary exterior

Al Meiklejohn Elementary exterior