Tilt-Up Concrete Assn.
PO Box 204
113 First Street W
Mt. Vernon, Iowa 52314
T: (319) 895-6911
F: (320) 213-5555
Send email to TCA
standard Distributing Company
Standard Sales Company, L.P
2005 Tilt-Up Achievement Award Winner
Distribution/Warehouse Division
Tilt-Up's design versatility allowed the owner to achieve a building that was cohesive with Anheuser-Busch’s 1870’s Brew House in St. Louis.

TCA Member Participants

Submitted By :
HDA (St. Louis, Missouri)
Tilt-Up Contractor:
Seretta Construction (Apopka, Florida)
Architect:
HDA
Engineer:
Alper Audi (St. Louis, Missouri)
Cast-in Materials: Innovative Brick Systems (Broomfield, Colorado)
Insulation System: Composite Technologies Corporation (Boone, Iowa)
Bond Breaker: Meadow Burke (Tampa, Florida)
Lifting Hardware: Meadow Burke
 

Located along the front range of the Rocky Mountains, this beer distribution facility replaced an existing building. The owner preferred a design that was cohesive with Anheuser-Busch’s 1870’s Brew House in St. Louis, Mo. yet would easily tie into the surrounding natural terrain. Close coordination with the City of Littleton also was key to project success.

The end-result was a facility that features auburn brick, limestone and a mahogany wooden ceiling with trusses. Accented stained concrete floors welcome visitors into the lobby, which is designed to be multi-functional and allow for large gatherings outside the hospitality suite.

The warehouse has an exterior brick column at 40-feet-on-center to give relief to the large panel. The office has a metal-sloped roof to screen the rooftop mechanical units and a ridged entry extended into the lobby featuring wood timber beams and ceiling. Brick venner was used to match the modular brick.

 

Related Projects

Dade Paper (2004)
Mia Shoes (2004)
Stapleton Business Center, Building E1 (2003)
Stapleton Business Center, Building B4 (2002)
Orr Safety Corporation (2002)
Location
Standard Sales Co.
Odessa, Texas
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Click to view larger image
Quick Facts
Project size:
68,191 sq.ft.
Tallest panel:
38' 0"
Largest panel:
1,100 sq.ft.
Heaviest panel:
96,000 lbs
Construction time :
240 days