2005 Tilt-Up Achievement Award Winner
Office Division
This Tilt-Up office in Madison, Wisconsin, perfectly captures the owners' desires for a head-turning design for their advertising agency.

TCA Member Participants

Submitted By :
Newcomb Construction Company (Madison, Wisconsin)
General Contractor:
Newcomb Construction Company
Tilt-Up Contractor:
Newcomb Construction Company
Engineer:
Newcomb Construction Company
Insulation System: Composite Technologies Corporation (Boone, Iowa)
Bond Breaker: Nox-Crete Products Group (Omaha, Nebraska)
Lifting Hardware: Meadow Burke (Tampa, Florida)
 

When Madison, Wis.-based advertising firm RS + K wanted a unique, distinctive design for their new office building, they knew exactly where to turn. For years, the agency has handled advertising for Newcomb Construction Company, the only Tilt-Up contractor in southwestern Wisconsin.

The owners’ desire for a head-turning design brought several complex elements to the project, such as irregularly shaped 8-foot-wide panels with 4-foot offsets for windows. The roof structure provided additional challenges, incorporating a 4-foot-high band of windows directly below the roof and a Douglass fir diaphragm roof deck with a 4-foot roof projection.

The structure also features a stair tower formed by eight curved panels surrounding a concrete paved stair for wind-bracing support. To meet the agency’s aesthetic needs, white concrete was used, along with steel cladding, which complements the owners’ collection of motorcycles. Clear glass and clear anodized aluminum framing were used to complement the exterior concrete and steel.

Judges selected this project for the intricate panel shapes that remind you of a jigsaw puzzle – an architectural element that is easily accomplished with Tilt-Up and nearly impossible with other construction methods. Further, the blending of construction materials – concrete with stainless steel “shingles” – was a tremendous success.

 

Related Projects

Security Central (2004)
CitiMortgage Operations Center (2004)
Chevron/Texaco (2004)
Orr Safety Corporation (2002)
Location
RS + K Advertising
Madison, Wisconsin
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 4
Click to view larger image
Quick Facts
Project size:
20,539 sq.ft.
Tallest panel:
37’ 8”
Largest panel:
566 sq.ft.
Heaviest panel:
68,900 lbs
Construction time :
224 days