Louisville Metro Commerce Center
Louisville Metro Commerce Center
2005 Tilt-Up Achievement Award Winner
Distribution/Warehouse Division
The owner had a number of requirements for this new industrial facility. Tilt-Up was the answer to those needs.

TCA Member Participants

Submitted By :
Kovert Hawkins Architects (Jeffersonville, Indiana)
Architect:
Kovert Hawkins Architects
 

With the goal of constructing a state-of-the-art distribution facility, Tilt-Up was selected for its architectural flexibility, speed of construction and cost-effectiveness. The architectural detail and first-class landscaping create a distribution center with the appearance of a Class A office facility.

Constructed at the Old Louisville Motor Speedway site, extensive demolition and challenging site conditions added to the complexity of the project. The facility offers a tan and green color scheme and is highlighted through the use of glass, aluminum framing and an upgraded paint system. A two-story curtain wall accented with aluminum perforated panels adds an increased level of detail at entry points. Stand-alone architectural Tilt-Up panels highlighted by decorative aluminum and steel were used to accentuate the corner entrances.

Special architectural treatments include perforated anodized aluminum panels, a two-story glass curtain wall and galvanized ornamental steel fabrications.

 

Related Projects

Dade Paper (2004)
Mia Shoes (2004)
Stapleton Business Center, Building E1 (2003)
Stapleton Business Center, Building B4 (2002)
Orr Safety Corporation (2002)
Location
Louisville Metro Commerce Center
Louisville, Kentucky
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Photo 6
Click to view larger image
Quick Facts
Project size:
517,000 sq.ft.
Tallest panel:
46' 0"
Largest panel:
1,118 sq.ft.
Heaviest panel:
66,864 lbs
Construction time :