Excel Academy Charter School K-8
Excel Academy Charter School K-8
2005 Tilt-Up Achievement Award Winner
Education Division
The Excel Academy school began construction in the middle of January and needed to be open by school-time in August. Tilt-Up allowed for the exterior to be up fast and enclosed so the contractor could focus on the finishes inside.

TCA Member Participants

Submitted By :
Saunders Construction, Inc. (Centennial, Colorado)
General Contractor:
Saunders Construction, Inc.
Tilt-Up Contractor:
Saunders Construction, Inc.
Insulation System: Composite Technologies Corporation (Boone, Iowa)
Bond Breaker: Nox-Crete Products Group (Omaha, Nebraska)
Form Release: Meadow Burke (Tampa, Florida)
Lifting Hardware: Meadow Burke
 

The efficiency of Tilt-Up allowed the building to flow better during construction, resulting in reduced cost and the effective addition of more area. The project began in the middle of January and needed to be open in late August. Tilt-Up allowed for the exterior to be up fast and enclosed so the contractor could focus on the finishes inside. The limited slab space required two separate pours for the panels.

The creative, angular image exhibited by the school’s architecture is reflective of Excel’s learning style in the classroom. The main walls separating the wings of the school were all exposed Tilt-Up, which significantly reduced the use of structural steel framing. Panels had a variety of shapes filled with formliners, most of which were recessed into the panels. Reveals were laid out at irregular angles, yet flow seamlessly from panel to panel. The darker colored paints used at the formliner areas create a visual depth to the already recessed panels. This, in contrast to the lighter field beige color, allows the panel’s articulation to stand out. Also, the architect did recesses within recesses making some panels look like they were separately formed panels welded together.

The most interesting aspect of the design was the trapezoidal shaped panels for the gymnasium. Another interesting attribute was the use of THERMOMASS insulation for the gym panels, which provided a durable surface capable of withstanding abuse during athletic events and a thermally efficient envelope.

Most of the exterior panels were very irregular in shape creating an assorted array of parapet elevations. There are numerous “layers” of panels with different parapet heights creating a very “busy” look. At outside corners, the architect designed the intersection of the panels at angles less than 90 degrees and then forced the top of the panels to slope toward the corner. This posed a challenge when forming the two panels that would marry to create this corner. The geometry needed to be exact through checking degrees of angles and panel heights before placing the concrete.

 

Related Projects

Central Davis Jr. High School (2003)
Lorenzo de Zavala School (2003)
Cumberland Elementary School (2001)
Location
Excel Academy Charter School K-8
Arvada, Colorado
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 4
Photo 4
Click to view larger image
Quick Facts
Project size:
44,000 sq.ft.
Tallest panel:
33' 0"
Largest panel:
500 sq.ft.
Heaviest panel:
80,000 lbs
Construction time :
210 days