Cornerstone Fellowship Church
Cornerstone Fellowship Church
2005 Tilt-Up Achievement Award Winner
Religious Division
The Cornerstone Fellowship Church needed a new facility to accomodate their continued growth. Redeveloping a vacant Tilt-Up sports facility solved that need.

TCA Member Participants

Submitted By :
Balch Enterprises, Inc. (Hayward, California)
Tilt-Up Contractor:
Balch Enterprises, Inc.
Tilt-Up Contractor:
Balch Enterprises, Inc.
Architect:
Ron Reese (Hayward, California)
Engineer:
Weatherby-Reynolds-Fritson Engineering (Jackson, CA)
Bond Breaker: Meadow Burke (Tampa, Florida)
Lifting Hardware: Meadow Burke
 

The Cornerstone Fellowship Church needed a new facility that would accommodate their growing congregation and scope of services, activities and community reach. Recognizing the challenge associated with raising funds for a new religious facility, the contractor presented the idea to redevelop a vacant 62,000-square-foot indoor sports facility to meet the church’s needs.

Constructed in the early 1990s, the original structure used load-bearing Tilt-Up wall panels. Therefore, the building had few interior columns, allowing the design team to transform the majority of the original structure into a 2,000-seat sanctuary with the help of seating structures cast inside the facility with Tilt-Up techniques. By relocating two 70,000-pound Tilt-Up walls panels, the team easily added 14,000 square feet to the building footprint which today comprises a stage and event area, nursery, classrooms and a youth center.

With the construction of a 34,000-square-foot second floor containing additional offices and classrooms, the facility is now about 110,000 square feet in size. A 10,000-square-foot courtyard dramatically upgraded the image of the facility, allowing congregants to feel like they are more a part of a neighborhood than an industrial setting.

 

Related Projects

Dade Paper (2004)
Mia Shoes (2004)
Stapleton Business Center, Building E1 (2003)
Las Colinas I (2003)
Stapleton Business Center, Building B4 (2002)
S.B. Ballard Construction Co. Office/Warehouse (2002)
Trends Clothing Corporation (2002)
Orr Safety Corporation (2002)
Location
Cornerstone Fellowship Church
Livermore, California
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 4
Photo 4
Click to view larger image
Quick Facts
Project size:
110,000 sq.ft.
Tallest panel:
30' 0"
Largest panel:
706 sq.ft.
Heaviest panel:
75,000 lbs
Construction time :
240 days