Boys & Girls Club – Teichert Branch
Boys & Girls Club – Teichert Branch
2005 Tilt-Up Achievement Award Winner
Special Projects Division
This project represented the culmination of 10 years of unwavering commitment between the local community members, businesses and other contributors who donated their services and time to bring vitality to this south Sacramento neighborhood.

TCA Member Participants

Submitted By :
Panattoni Construction (Sacramento, California)
General Contractor:
Panattoni Construction
Tilt-Up Contractor:
Panattoni Construction
Insulation System: Dryvit Systems Inc (West Warwick, Rhode Island)
Form Release: Nox-Crete Products Group (Omaha, Nebraska)
Bond Breaker: Nox-Crete Products Group
Lifting Hardware: Dayton Superior (Miamisburg, Ohio)
 

Although the owner was unfamiliar with Tilt-Up, the Teichert Branch of the Boys and Girls Club selected the method for its cost-effectiveness and design flexibility. This project represented the culmination of 10 years of unwavering commitment between the local community members, businesses and other contributors who donated their services and time to bring vitality to this south Sacramento neighborhood.

Equipped to serve more than 10,000 young people living within a two-mile radius of the club, the facility was designed and built specifically for youth programs and activities. The interior space accommodates classrooms and centers for computer education, library learning, science and teens. Further, the facility also houses the Kid’s Café, gymnasium, community multi-purpose room, kitchen, main activities game room and administrative offices. The exterior includes a covered patio that overlooks a soccer field and vegetable garden.

The design scheme included the use of bright, energetic and youthful colors. Acoustical wall panels as well as perforated and insulated decking were used to minimize noise in the open-air environment. Extensive use of glass and glazing ensured lines of sight that resulted in child and employee safety.

Architectural treatments and features included arches at the panel parapets, selected use of reveals for external color breaks, exposed metal roof deck, roof trusses, curved wall panels and a two-story lobby with extensive use of sheetrock and reveals.

 

Related Projects

Gleneagles Community Centre (2004)
Jade Stadium Redevelopment (2003)
Seawalk Performance Pavilion (2002)
Location
Boys & Girls Club
Teichert Branch
Sacramento, California
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 4
Click to view larger image
Quick Facts
Project size:
32,538 sq.ft.
Tallest panel:
33' 6 "
Largest panel:
864 sq.ft.
Heaviest panel:
71,200 lbs
Construction time :
209 days