2005 Tilt-Up Achievement Award Winner
Office Division
Amatrol selected Tilt-Up for the construction of their new facility because the method was cost-effective to construct, durable and aesthetically appealing.

TCA Member Participants

Submitted By :
AML, Inc. (Floyd’s Knobs, Indiana)
General Contractor:
AML, Inc.
Tilt-Up Contractor:
AML, Inc.
Architect:
Kovert Hawkins Architects (Jeffersonville, Indiana)
Bond Breaker: Dayton Superior (Miamisburg, Ohio)
Lifting Hardware: Dayton Superior
 

One of the most challenging elements of this project was the curved panels. The erection and connection of these panels, some of which weigh 13.5 tons, were effectively held in place by a cantilevered connection. The connection detail was designed to allow for expansion – an important component for the owner – but it was very difficult to execute during erection since the panels were to “hang” off of the connections. To add to the difficulty, the curved panels were attached to round columns that made it very difficult to take measurements and connections had to be made in a confined area.

Careful consideration was taken to the design of the front elevation. The curved architectural feature creates an elevated conference room that allows for the much-desired panoramic view of downtown Louisville. To accomplish this, the architect used the combination of curved Tilt-Up concrete panels, blue colored glass and concrete columns. By elevating the conference room, it allowed the main entrance to become part of an elaborate curved projection.

For the exterior of the facility, the owner wanted natural and neutral colors. As such, varying shades of beige were used as the field and accent colors. The corporate color of navy blue was utilized in the reveal line to accentuate the shades of beige. The blue glazing of the large curtain walls and storefront maintains the accent.

 

Related Projects

Security Central (2004)
CitiMortgage Operations Center (2004)
Chevron/Texaco (2004)
Orr Safety Corporation (2002)
Location
Amatrol
Jeffersonville, Indiana
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 4
Click to view larger image
Quick Facts
Project size:
80,000 sq.ft.
Tallest panel:
41' 11 "
Largest panel:
800 sq.ft.
Heaviest panel:
85,000 lbs
Construction time :
112 days