Vista Ridge High School
Hoover High School Event Center
2004 Tilt-Up Achievement Award Winner
Educational Division
Fresno Unified is the fifth largest school district in California, but up until this building was completed, they didn’t have a facility large enough to comfortably seat all of their faculty members and administrators at one time. Thanks, in part, to Tilt-Up they do now.

TCA Member Participants

Submitted By:
Teter Consultants (Fresno, California)
Owner:
Fresno Unified School District
Architect:
Teter Consultants
Engineer:
Teter Consultants
Bond Breaker:
Lifting Hardware:
Dayton/Richmond Concrete Accessories (Miamisburg, OH)
 

The original Hoover High School Gymnasium was constructed in 1963 and was characterized as being undersized from the day it opened. Further, not only was the gym too small, it was inaccessible to the physically disabled, which made the need for a new gymnasium critical.

The 27,522-square-foot addition was designed to tie-in with the existing gym to create an “ Event Center.” Tilt-Up was selected for its attributes of low-maintenance, durability and fire-resistance, as well as the need to match the construction of the existing gym.

Great use of the juxtaposition of elements and materials prompted the judges to choose the project for an award.

Since the new gymnasium was built adjacent to the original facility, the team worked hard to incorporate a solution that successfully deemphasized the existing entry to the old gym by providing a new curvilinear raised concrete planter that redirects the circulation pattern. This planter area is landscaped with a row of coast Redwood trees to further act as a visual screen of the old entry, which now becomes a secondary entrance to be used only by the students and staff.

Tilt-Up was selected because it provided a clean facility without numerous interior columns. To minimize the visual impact a big box gymnasium would have on the school, trapezoidal flutes and reveals were utilized to create patterns in the concrete, breaking down the box.

With seating for more than 2,800 students with folding chairs on the court, the event center has become the meeting place for district wide functions that require a large seating capacity.

Location
Hoover Event Center
5550 North First Street
Fresno, CA 93710
Photos
Photo 1
Photo 2
Click to view larger image
Quick Facts
Total floor area:
27,522 sq.ft.
Total cost:
$207 / sq.ft.
Comp cost:
$203 / sq.ft.
Tallest panel:
39' - 0 "
Largest panel:
858 sq.ft.
Heaviest panel:
99,000 lbs
Shell construction:
365 days