CitiMortgage
CitiMortgage Operations Center
2004 Tilt-Up Achievement Award Winner
Office Division
When fully occupied, the three-story CitiMortgage Operations Center building will house up to 5,000 Citigroup employees, providing them with a full-service cafeteria, an exercise facility, open floor plans with perimeter window views, indirect lighting at all open office areas to reduce computer screen glares, and an exterior amenities patio.

TCA Member Participants

Submitted By:
Clayco Construction Company
Owner:
CitiGroup
Engineer:
Alper Audi (St. Louis, MO)
General Contractor:
Clayco Tilt-Up (St. Louis, MO)
Tilt-Up Contractor:
Clayco Tilt-Up
Cast-in Materials:
Scott System, Inc. (Denver, CO)
Bond Breaker:
Lifting Hardware :
Meadow Burke (Tampa, FL)
 

The largest construction project in St. Louis in several years, the 515,000-square-foot CitiMortgage Operations Center combined four different venues into one location. Tilt-Up enabled the design-build team to meet the aggressive schedule and aesthetic requirements.

The judges said they selected the project for an award because it is simply well-designed.

A particularly rainy spring in St. Louis caused the project to fall 40 days behind schedule. However, by utilizing Tilt-Up and design-build, the contractor was able to not only get back on schedule, but actually finish ahead of schedule.

The three-story building will house up to 5,000 Citigroup employees and was constructed so that additional wings could be added to accommodate personnel growth. This modern facility offers many employee benefits, including a full-service cafeteria, exercise facility, open floor plans with perimeter window views, convenient highway access, exterior amenities patio and indirect lighting at all open office areas to reduce glare on a computer screen.

The color and texture of the thin brick system, coupled with the landscaping, lighting and store wall that surrounds the facility, provide a corporate feel that is suitable for the suburban environment.

Location
CitiMortgage Ops Center
Progress Point Business Park
O'Fallon, MO 63304
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Click to view larger image
Quick Facts
Total floor area:
515,000 sq.ft.
Total cost:
$14.45 / sq.ft.
Completed cost:
$21.50 / sq.ft.
Tallest panel:
68' - 7.5"
Largest panel:
1,445 sq.ft.
Heaviest panel:
167,000 lbs
Shell construction :
10 weeks