Stapleton Business Center Bldg E1
Stapleton Business Center Bldg E1
2003 Tilt-Up Achievement Award Winner
Distribution/Warehouse Division
Familiar with the freedom and delivery site cast Tilt-Up construction offers, this tenant -- Ford Motor Company -- selected the construction method to meet their needs.

TCA Member Participants

Submitted By:
Catellus Development Corporation (Lakewood, Colorado)
Owner:
Catellus Development Corporation
Tilt-Up Contractor:
CAL Construction (Lakewood, Colorado)
Bond Breaker:
Meadow Burke (Sacramento, California)
Lifting Hardware:
Meadow Burke
 

The 314,978-square-foot Stapleton Business Center Building E1 in Denver, Colo. was selected as the Best in Class winner in the Distribution & Warehouse category.

The overall complexity of this project was driven by the challenge of producing an aesthetically superior building façade to accommodate the demands of a high-profile building visible from the freeway, within the confines of a tight budget and an accelerated schedule. Familiar with the freedom and delivery site cast Tilt-Up construction offers, the tenant -- Ford Motor Company -- selected the construction method to meet their needs.

In order to create visual interest, accent panels were included providing relief on the building. Theses elements provided the opportunity to create shadow lines, supplied an opportunity for variation of color, and added distinctive recognizable architectural shapes. Three separate paint colors were used to create variation on the long building façade. Reveals, recesses, accent panels, changes in facade plane, and glass elements were all incorporated into the building design to create an innovative, state-of-the-art structure.

With the shell completed in only 210 days, Tilt-Up was certainly the best choice.

Location
Stapleton Business Center Bldg E1
Denver, Colorado
Photos
Photo 1
Photo 2
Photo 3
Click to view larger image
Quick Facts
Total floor area:
314,978 sq.ft.
Total cost:
$23.87 / sq.ft.
Tallest panel:
45' - 0 "
Largest panel:
1,000 sq.ft.
Heaviest panel:
100,000 lbs
Shell construction:
210 days