Lucent Technologies
Lucent Technologies
2003 Tilt-Up Achievement Award Winner
Architect's Choice Winner
Speed of construction and versatility were the main reasons that Tilt-Up was chosen for this modern facility.

TCA Member Participants

Submitted By:
Woodland Construction (Jupiter, Florida)
Owner:
Lucent Technologies
General Contractor:
Clayco Construction (St. Louis, Missouri)
Tilt-Up Contractor:
Woodland Construction
Tilt-Up Erector:
Sunshine Specialties Inc. (Orlando, Florida)
 

What was the Overall Complexity of the project?
Very heavy, thick panels lifted full height and many non-structural design elements produced with Tilt-Up stand-off panels. Walls were erected on stem wall foundations.

Why Did the Owner Select Tilt-Up?
Speed of construction and versatility.

What were the special architectural treatments?
Many stand-off Tilt-Up design features.

What were the outstanding features?
Special radius sill details.

Location
Lucent Technologies
Miramar, Florida
Photos
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Click to view larger image
Quick Facts
Total floor area:
308,496 sq.ft.
Total cost:
$12.50 / sq.ft.
Tallest panel:
62' - 0 "
Largest panel:
1,984 sq.ft.
Heaviest panel:
224,000 lbs
Shell construction:
60 days