Tilt-Up Concrete Assn.
PO Box 204
113 First Street W
Mt. Vernon, Iowa 52314
T: (319) 895-6911
F: (320) 213-5555
Send email to TCA
Stapleton Business Ctr, Building B4
Stapleton Business Center, Bldg B4
2002 Tilt-Up Achievement Award Winner
Warehouse/Distribution Division
Tilt-Up's architectural aesthetics allows this large warehouse to look more like a retail facility.

TCA Member Participants

Submitted By:
Odell Architects, P.C.
Architect: Odell Architects, P.C.
General Contractor:
CAL Construction
Tilt-Up Contractor:
CAL Construction
Bond Breaker :
Meadow Burke (Tampa, Florida)
Accessories:
Meadow Burke
 

The Building B4 at Stapleton Business Center in Denver, Colorado, occupied by L.A. Loving and Dreyer's Grand Ice Cream, was completed in 230 days. Odell Architects, P.C. utilized a cast-in brick, reveals formliners, and storefront aluminum systems with glazing and EIFS cornices above the entry to achieve the distinctive look.

According to this year's judges, the architectural treatments on the 161,000-square-foot structure more closely resemble a retail facility than warehouse space.

For more information on this project, contact Brent Stuart at (801) 292-1411.


Location
Stapleton Business Ctr, Building B4
Denver, Colorado
Photos
Photo 1
Photo 2
Photo 3
Click to view larger image
Quick Facts
Total floor area:
160,645 sq.ft.
Tallest panel:
45' - 0 "
Heaviest panel:
88,000 lbs
Construction time:
180 days
Related Projects
OCLI (2002)
Orr Safety (2002)
SB Ballard (2002)