Cyber Fortress II
Cyber Fortress II
2002 Tilt-Up Achievement Award Winner
Special Projects Division
Optical Coating Laboratory needed a new facility to keep up with the high demand for their product in the fast paced telecommunications industry. Tilt-Up construction helped them meet their stringent requirements.

TCA Member Participants

Submitted By:
Stephens, Aylward & Associates
Owner:
DataCenters NOW
Architect: Stephens, Aylward & Associates
Engineer: Watkins Partnership
General Contractor:
Clark-Global Technologies
Tilt-Up Contractor:
Southland Concrete (Dulles, Virginia)
Accessories:
Meadow Burke (Tampa, Florida)
 

As one would imagine with a name like "Cyber Fortress" the owner required a secure facility - bomb proof, if possible. While there was little doubt that Tilt-Up could provide the desired durability, the owner, Data Centers NOW, also demanded an attractive appearance for their "secure" structure.

Architectural firm Stephens, Aylward & Associates accomplished both using graceful Tilt-Up curves cast into the panels to break down the scale of this windowless building located in Manassas, Virginia.

Tilt-Up lived up to its reputation as "fast-track": the 109,800 square foot two-story facility was completed in only seven months and could not have been accomplished with metal due to the ballistics requirement. Tilt-Up and poured-in- place screen walls provided ground and roof mechanical areas with security and visual barriers, as well as the protection of large fuel tanks and seven generators.

For more information on this special project, contact Thomas Aylward at (301) 513-0600.

Location
Cyber Fortress II
Manassas, Virginia
Photos
Photo 1
Photo 2
Click to view larger image
Quick Facts
Total floor area:
109,800 sq.ft.
Tallest panel:
53' - 10 "
Heaviest panel:
94,019 lbs
Construction time:
175 days